Komatsu PC1800-6 Galeo Hydraulic Excavator Field Assembly Instruction SEAW003503
$20.00
- Type Of Manual: Field Assembly Instruction
- Manual ID: SEAW003503
- Format: PDF
- Size: 78.2MB
- Number of Pages: 289
-
Model List:
- PC1800-6 Galeo Hydraulic Excavator
- 1. COVER
- 2. CONTENTS
- 3. GENERAL
- 3.1. SPECIFICATIONS
- 3.2. POINTS REGARDING LOCAL ASSEMBLY
- 3.3. BOLT TIGHTENING TORQUE AND BOLT TIGHTENING TOOLS
- 3.4. SEPARATE UNITS
- 3.5. LIST OF PARTS SENT INDIVIDUALLY
- 3.6. ASSEMBLY PROCEDURE, ASSEMBLY EQUIPMENT AND SCHEDULE
- 3.7. KIT LAYOUT DIAGRAM
- 3.8. TOOLS AND EQUIPMENT TO BE USED
- 4. COMPONENTS TO BE ASSEMBLED IN HARBOR
- 4.1. COOLING SUB ASSY
- 4.2. FUEL TANK SUB ASSY
- 4.3. HYDRAULIC TANK SUB ASSY
- 4.4. SUCTION TUBE SUB ASSY
- 4.5. OIL COOLER LINE
- 4.6. SWING MACHINERY SUB ASSY
- 4.7. HOOD (SMALL) SUB ASSY
- 4.8. RIGHT SIDE DOOR SUB ASSY
- 4.9. RIGHT SIDE DUCT SUB ASSY
- 4.10. PARTITION COVER
- 4.11. MUFFLER COVER
- 4.12. BATTERY CASE SUB ASSY
- 5. ASSEMBLY OF CHASSIS
- 5.1. A1 ASSEMBLY OF TRACK FRAME AND AXLE
- 5.2. A2 TRAVEL MOTOR PIPING
- 5.3. A3 IDLER CUSHION CYLINDER PIPING
- 5.4. A4 INSTALLATION OF TRAVEL MOTOR GUARD
- 5.5. A5 FILLING SWING CIRCLE WITH GREASE
- 5.6. A6 ASSEMBLY OF REVOLVING FRAME ASSEMBLY AND AXLE ASSEMBLY
- 5.7. A7 SWIVEL TRAVEL PIPING
- 5.8. A8 SWING CIRCLE GREASE TUBE PIPING
- 5.9. A9 INSTALLATION OF LEFT AND RIGHT LADDERS
- 5.10. A10 INSTALLATION OF LEFT CATWALK (STD)
- 5.11. A11 INSTALLATION OF RIGHT CATWALK
- 5.12. A12 INSTALLATION OF CATWALK, HANDRAIL BESIDE OPERATORS CAB
- 5.13. A13 INSTALLATION OF OPERATORS CAB LADDER
- 5.14. A14 INSTALLATION OF OPERATORS CAB HANDRAIL
- 5.15. A16 INSTALLATION OF HANDRAIL AT REAR OF OPERATORS CAB
- 5.16. A18 OPERATORS CAB FRONT FRAME, HANDRAIL
- 5.17. A20 RIGHT DECK HANDRAIL
- 5.18. A21 INSTALLATION OF LADDER ON TOP OF HYDRAULIC TANK
- 5.19. A22 INSTALLATION OF COUNTERWEIGHT
- 5.20. A23 INSTALLATION OF COUNTERWEIGHT LADDERS (LEFT AND RIGHT)
- 5.21. A24 INSTALLATION OF HANDRAIL ON TOP OF FUEL TANK, COUNTERWEIGHT
- 5.22. A25 INSTALLATION OF FUEL TANK VIBRATION STOPPER BRACKET
- 5.23. A26 INSTALLATION OF GREASE REEL, HOSE, BRACKET
- 5.24. A27 INSTALLATION OF LEFT CAB BASE ASSEMBLY
- 5.25. A28 INSTALLATION OF OPERATORS CAB ASSEMBLY
- 5.26. A29 INSTALLATION OF WIPER MOTOR COVER INSIDE OPERATORS CAB
- 5.27. A30 INSTALLATION OF UPPER HANDRAIL OF LEFTHAND DOOR COVER
- 5.28. A31 HANDRAILS ABOVE THE RH DOOR AND ABOVE THE HYDRAULIC OIL TANK
- 5.29. A32 EMERGENCY STOP SWITCH, FUEL CUT LEVER
- 5.30. A33 HANDRAIL ABOVE THE RADIATOR
- 5.31. A34 CONNECTION OF HYDRAULIC PIPING OPERATORS CAB ASSEMBLY
- 5.32. A35 CONNECTION OF WINDOW WASHER HOSE OF OPERATORS CAB ASSEMBLY
- 5.33. A36 CONNECTION OF AIR PIPING OF LEFT CAB BASE ASSEMBLY
- 5.34. A37 CONNECTION OF GREASE PIPING OF OPERATIONS CAB ASSEMBLY
- 5.35. A38 CONNECTION OF WIRING HARNESS IN CAB BASE
- 5.36. A39 PIPING OF AIR CONDITIONER DISCHARGE HOSE
- 5.37. A40 INSTALLATION OF HEAD GUARD
- 5.38. A41 INSTALLATION OF ORBCOMM ANTENNA
- 5.39. A42 CONNECTION OF BATTERY CABLE
- 5.40. A43 START ENGINE
- 5.41. A44 FINAL TIGHTENING OF SWING CIRCEL MOUNTING BOLTS
- 5.42. L1 INSTALLATION OF LEFTHAND CATWALK AND POWERASSISTED LADDER
- 6. INSTALLATION PROCEDURES
- 6.1. C1 INSTALLATION OF BOOM CYLINDRE TO CHASSIS
- 6.2. C2 INSTALLATION OF BOOM CYLINDER PIPING
- 6.3. C3 BLEEDING AIR FROM BOOM CYLINDER
- 6.4. C4 BOOM SUBASSEMBLY
- 6.5. C5 INSTALLATION OF BOOM ASSEMBLY
- 6.6. C6 INSTALLATION OF BOOM CYLINDER TOP PIN
- 6.7. C7 CONNECTION OF ARM ASSEMBLY TO BOOM
- 6.8. C8 INSTALLATION OF HOSES BETWEEN BOOM AND CHASSIS
- 6.9. C9 INSTALLATION OF ARM CYLINDER TOP PIN
- 6.10. C10 BLEEDING AIR FROM ARM CYLINDER
- 6.11. C11 INSTALLATION OF HYDRAULIC HOSES BETWEEN BOOM AND ARM
- 6.12. C12 CONNECTION OF GREASE PIPING
- 6.13. C13 CONNECTION OF WIRING BETWEEN BOOM AND CHASSIS
- 6.14. C14 INSTALLATION OF HOSES BETWEEN BOOM AND CHASSIS
- 6.15. C16 CONNECTION OF BUCKET ASSEMBLY TO ARM
- 6.16. C17 INSTALLATION OF BUCKET LINK
- 6.17. C18 BLEEDING AIR FROM BUCKET CYLINDER
- 7. INSPECTION AND SERVICING PROCEDURES
- 7.1. M1 INSPECTING THE OIL LEVEL AND WATER LEVEL
- 7.2. M2 FLUSHING OF HYDRAULIC CIRCUIT
- 7.3. M3 RELEASING RESIDUAL PRESSURE FROM HYDRAULIC CIRCUIT
- 8. INITIALIZATION PROCEDURES FOR VHMS CONTROLLER
- 9. SETTING PROCEDURES FOR REPLACING VHMS CONTROLLER
- 10. FIELD ASSEMBLY INSPECTION REPORT
Komatsu Operation and Maintenance Manual PDF
Komatsu 430FX-1, 430FXL-1, 445FXL-1 Operation and Maintenance Manual CEAM023702
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG745
Komatsu Operation and Maintenance Manual PDF
Komatsu 210M Dump Truck Operation and Maintenance Manual DG615
Komatsu Operation and Maintenance Manual PDF
Komatsu 210M Dump Truck Operation and Maintenance Manual DG714
Komatsu Operation and Maintenance Manual PDF
Komatsu 4D104E, S4D104E Series Diesel Motor Operation and Maintenance Manual WHBMNEF000
Komatsu Operation and Maintenance Manual PDF
Komatsu 530M Dump Truck Operation and Maintenance Manual DG716
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG713
Komatsu Operation and Maintenance Manual PDF
Komatsu Operation and Maintenance Manual PDF
Komatsu 515C, 520C Operation and Maintenance Manual OM515C520C99-1E
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM014901