Bomag BW 202 AD-5 Tandem Vibratory Roller Operating and Maintenance Instructions 00820077
$20.00
- Type Of Manual: Operating and Maintenance Instructions
- Manual ID: 00820077
- Format: PDF
- Size: 7.8MB
- Number of Pages: 208
- Serial Number:
101921111001 and up
-
Model List:
- BW 202 AD-5 Tandem Vibratory Roller
- 1. Table of contents
- 2. Introduction
- 2.1. Foreword
- 2.2. Machine type plate and engine type plate
- 3. Technical data
- 3.1. Noise and vibration data
- 4. Concerning your safety
- 4.1. General prerequisites
- 4.2. Terminological definition of the responsible persons
- 4.3. Fundamentals for safe operation
- 4.4. Safety regulations and environmental protection regulations when handling fuels and lubricants
- 4.5. Load/transport the machine
- 4.6. Taking the machine into service
- 4.7. Driving the machine, working operation
- 4.8. Refuelling
- 4.9. DPFregeneration
- 4.10. What to do in events of emergency
- 4.11. Maintenance work
- 4.12. Repair
- 4.13. Information and safety stickers/decals on the machine
- 5. Display and control elements
- 5.1. Operators stand
- 5.2. Cabin
- 5.3. ROPS
- 5.4. Engine compartment
- 5.5. Precision spreader
- 6. Tests before taking into operation
- 6.1. Notes on safety
- 6.2. Visual inspections and function tests
- 6.3. Checking the engine oil level
- 6.4. Checking the fuel level, topping up fuel
- 6.5. Checking the hydraulic oil level
- 6.6. Check the coolant level
- 6.7. Checking the water level, topping up
- 6.8. Checking, adjusting the scrapers
- 6.9. Checking the precision spreader, cleaning the spreading beam
- 7. Operation
- 7.1. Setup the work place
- 7.2. Electronic immobilizer
- 7.3. Start the engine
- 7.4. Travel operation
- 7.5. Working with vibration
- 7.6. Operating the crabwalk
- 7.7. Operating the pressure sprinkler system
- 7.8. Park the machine in secured condition.
- 7.9. Open the engine hood
- 7.10. Operating the heating/air conditioning system
- 7.11. DPFregeneration
- 7.12. Edge cutter
- 7.13. Precision spreader
- 7.14. What to do in events of emergency
- 8. Loading/transporting the machine
- 8.1. Prepare for transport
- 8.2. Load the machine
- 8.3. Lashing the machine to the transport vehicle
- 8.4. Loading by crane
- 8.5. After transport
- 8.6. Engaging / releasing the articulation lock
- 9. Maintenance
- 9.1. Preliminary remarks and safety notes
- 9.2. Fuels and lubricants
- 9.3. Table of fuels and lubricants
- 9.4. Runningin instructions
- 9.5. Maintenance table
- 9.6. Every 50 operating hours
- 9.7. Every 250 operating hours
- 9.8. Every 500 operating hours
- 9.9. Every 1000 operating hours
- 9.10. Every 2000 operating hours
- 9.11. Every 3000 operating hours
- 9.12. As required
- 10. Trouble shooting
- 10.1. Preliminary remarks
- 10.2. Starting the engine with jump leads
- 10.3. Fuse assignment
- 10.4. Engine faults
- 11. Disposal
- 11.1. Final shutdown of machine
- 12. List of special tools
Bomag Operator Manual PDF
Bomag BPR 65-70 D Vibrating Plate Operating and Maintenance Instructions 00805246
Bomag Operator Manual PDF
Bomag BF 700 C-2 Paver Operating and Maintenance Instructions 00820031
Bomag Operator Manual PDF
Bomag Operator Manual PDF
Bomag BC 670 RB Refuse Compactor Operating and Maintenance Instructions 00816061
Bomag Operator Manual PDF
Bomag BW 174 APO-4i Tandem Vibratory Roller Operating and Maintenance Instructions 00820287
Bomag Operator Manual PDF
Bomag BM 2200-75 Cold Planer Operating and Maintenance Instructions 00820166
Bomag Operator Manual PDF
Bomag BMF 2500 S, BMF 2500 M Feeder Operating and Maintenance Instructions 00890004
Bomag Operator Manual PDF
Bomag BF 900 C Paver Operating and Maintenance Instructions 00808181
Bomag Operator Manual PDF