Komatsu D375A-3 Bull Dozer Operation and Maintenance Manual SEAM010801
$20.00
- Type Of Manual: Operation and Maintenance Manual
- Manual ID: SEAM010801
- Format: PDF
- Size: 13.3MB
- Number of Pages: 248
-
Model List:
- D375A-3 Bull Dozer
- 1. MAIN MENU
- 2. FOREWORD
- 3. SAFETY INFORMATION
- 4. INTRODUCTION
- 5. LOCATION OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 6. CONTENTS
- 7. SAFETY
- 7.1. GENERAL PRECAUTIONS
- 7.2. PRECAUTIONS DURING OPERATION
- 7.2.1. BEFORE STARTING ENGINE
- 7.2.2. OPERATING MACHINE
- 7.2.3. TRANSPORTATION
- 7.2.4. BATTERY
- 7.2.5. TOWING
- 7.3. PRECAUTIONS FOR MAINTENANCE
- 7.3.1. BEFORE CARRYING OUT MAINTENANCE
- 7.3.2. DURING MAINTENANCE
- 7.4. POSITION FOR ATTACHING SAFETY LABELS
- 7.4.1. POSITION FOR ATTACHING SAFETY LABELS
- 7.4.2. CONTENT AND USE OF WARNING PLATES
- 8. OPERATION
- 8.1. GENERAL VIEW
- 8.1.1. GENERAL VIEW OF MACHINE
- 8.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 8.2. EXPLANATION OF COMPONENTS
- 8.2.1. FRONT PANEL
- 8.2.2. SWITCHES
- 8.2.3. CONTROL LEVERS AND PEDALS
- 8.2.4. DUST INDICATOR
- 8.2.5. POWER SOURCE
- 8.2.6. FUSE BOX
- 8.2.7. DOOROPEN LOCK (MACHINES EQUIPPED WITH CAB)
- 8.2.8. SASH GLASS INTERMEDIATE LOCK (MACHINES EQUIPPED WITH CAB)
- 8.2.9. DOOR POCKET (MACHINES EQUIPPED WITH CAB)
- 8.2.10. ASHTRAY (MACHINES EQUIPPED WITH CAB)
- 8.2.11. TOOL BOX
- 8.2.12. USING CAR STEREO (MACHINES EQUIPPED WITH CAB AND CAR STEREO)
- 8.2.13. HANDLING AIR CONDITIONER (MACHINES EQUIPPED WITH CAB)
- 8.2.14. HANDLING HEATER (MACHINES EQUIPPED WITH CAB)
- 8.2.15. HANDLING ACCUMULATOR
- 8.3. OPERATION
- 8.3.1. CHECK BEFORE STARTING ENGINE
- 8.3.2. STARTING ENGINE
- 8.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
- 8.3.4. MOVING MACHINE
- 8.3.5. SHIFTING GEAR
- 8.3.6. SHIFTING BETWEEN FORWARD AND REVERSE
- 8.3.7. STEERING MACHINE
- 8.3.8. STOPPING MACHINE
- 8.3.9. PRECAUTIONS FOR OPERATION
- 8.3.10. WORK POSSIBLE USING BULLDOZER
- 8.3.11. RIPPER OPERATION
- 8.3.12. ADJUSTMENT OF WORK EQUIPMENT
- 8.3.13. EFFECTIVE USE OF MODE SELECTION SYSTEM
- 8.3.14. PARKING MACHINE
- 8.3.15. CHECK AFTER FINISHING WORK
- 8.3.16. STOPPING ENGINE
- 8.3.17. CHECK AFTER STOPPING ENGINE
- 8.3.18. LOCKING
- 8.3.19. TIPS FOR LONGER UNDERCARRIAGE LIFE
- 8.4. TRANSPORTATION
- 8.4.1. LOADING, UNLOADING WORK
- 8.4.2. PRECAUTIONS FOR LOADING
- 8.4.3. METHOD OF LIFTING MACHINE
- 8.4.4. PRECAUTIONS FOR TRANSPORTATION
- 8.4.5. REMOVAL OF CAB (MACHINES EQUIPPED WITH CAB)
- 8.4.6. INSTALLATION OF CAB
- 8.5. COLD WEATHER OPERATION
- 8.5.1. PRECAUTIONS FOR LOW TEMPERATURE
- 8.5.2. AFTER COMPLETION OF WORK
- 8.5.3. AFTER COLD WEATHER
- 8.6. LONGTERM STORAGE
- 8.6.1. BEFORE STORAGE
- 8.6.2. DURING STORAGE
- 8.6.3. AFTER STORAGE
- 8.7. TROUBLESHOOTING
- 8.7.1. AFTER RUNNING OUT OF FUEL
- 8.7.2. METHOD OF TOWING MACHINE
- 8.7.3. IF BATTERY IS DISCHARGED
- 8.7.4. OTHER TROUBLE
- 8.7.5. IF MODE SELECTION SYSTEM FLASHES
- 9. MAINTENANCE
- 9.1. GUIDES TO MAINTENANCE
- 9.2. OUTLINES OF SERVICE
- 9.2.1. OUTLINE OF OIL, FUEL, COOLANT
- 9.2.2. RELATING TO ELECTRIC SYSTEM
- 9.3. WEAR PARTS LIST
- 9.4. USE OF FUEL COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
- 9.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 9.5.1. INTRODUCTION OF NECESSARY TOOLS
- 9.5.2. TORQUE LIST
- 9.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 9.7. MAINTENANCE SCHEDULE CHART
- 9.8. SERVICE PROCEDURE
- 9.8.1. INITIAL 250 HOURS SERVICE
- 9.8.2. WHEN REQUIRED
- 9.8.3. CHECK BEFORE STARTING
- 9.8.4. EVERY 250 HOURS SERVICE
- 9.8.5. EVERY 500 HOURS SERVICE
- 9.8.6. EVERY 1000 HOURS SERVICE
- 9.8.7. EVERY 2000 HOURS SERVICE
- 9.8.8. EVERY 4000 HOURS SERVICE
- 10. SPECIFICATIONS
- 10.1. SPECIFICATIONS
- 11. OPTIONS, ATTACHMENTS
- 11.1. GENERAL PRECAUTIONS
- 11.1.1. PRECAUTIONS RELATED TO SAFETY
- 11.2. USING SEAT BELT
- 11.2.1. FASTEN THE BELT AND REMOVE IT IN THE FOLLOWING MANNER
- 11.3. SELECTION OF TRACK SHOE
- 11.3.1. SELECTION OF TRACK SHOES
- 11.4. PROCEDURE FOR SELECTING RIPPER POINT
- 11.4.1. PROCEDURE FOR SELECTING RIPPER POINT
- 11.5. HANDLING CAP WITH LOCK
- 11.5.1. OPENING AND CLOSING LOCKABLE CAP
- 11.6. EFFECTIVE METHOD OF OPERATION FOR DUAL TILT DOZER
- 11.6.1. BLADE CONDITION
- 11.6.2. DOZING WORK
- 11.6.3. LEVELING (SPREADING) OPERATIONS
- 11.6.4. DITCHING OPERATIONS
- 11.6.5. BOULDER RAISING OPERATIONS
- 11.6.6. SIDECUTTING OPERATIONS
- 11.6.7. HORIZONTAL DOZING OPERATIONS FROM SIDE SLOPE (ROUGH GROUND)
Komatsu Operation and Maintenance Manual PDF
Komatsu 170D Dump Truck Operation and Maintenance Manual DG534
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Field Assembly Instruction CEAW004103
Komatsu Operation and Maintenance Manual PDF
Komatsu 210M Dump Truck Operation and Maintenance Manual DG692
Komatsu Operation and Maintenance Manual PDF
Komatsu 515C, 520C Operation and Maintenance Manual OM515C520C99-1E
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG745
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAD014800
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG729
Komatsu Operation and Maintenance Manual PDF
Komatsu 450FXL-1 Crawler Feller Buncher Operation and Maintenance Manual CEAM023802
Komatsu Operation and Maintenance Manual PDF
Komatsu 410W Hydraulic Excavator Operation and Maintenance Manual UMGB410W1
Komatsu Operation and Maintenance Manual PDF
Komatsu 503 Motor Grader Operation and Maintenance Manual 2079A-H45