Komatsu PC5500-6 Hydraulic Mining Shovel Operation and Maintenance Manual OMPC550015011
$20.00
- Type Of Manual: Operation and Maintenance Manual
- Manual ID: OMPC550015011
- Format: PDF
- Size: 6.4MB
- Number of Pages: 466
-
Model List:
- PC5500-6 Hydraulic Mining Shovel
- 1. MAIN MENU
- 2. COVER
- 3. INTRODUCTION
- 3.1. CONTENTS OF THE BINDER
- 3.2. DIVISION OF THE BINDER
- 3.3. DESIGNATED USE OF THE EXCAVATOR
- 3.4. DELIVERY OF THE EXCAVATOR
- 3.5. EXPLANATION OF ABBREVATIONS
- 3.6. TABLE OF CONTENTS
- 4. SAFETY
- 4.1. SAFETY INSTRUCTIONS
- 4.1.1. WARNINGS AND SYMBOLS
- 4.1.2. BASIC OPERATION AND DESIGNATED USE OF THE HYDRAULIC EXCAVATOR
- 4.1.3. ORGANIZATIONAL MEASURES
- 4.1.4. SELECTION AND QUALIFICATION OF PERSONNEL BASIC RESPONSIBILITIES
- 4.1.5. SAFETY INSTRUCTIONS GOVERNING SPECIFIC OPERATIONAL PHASES
- 4.1.6. WARNING OF SPECIAL DANGERS
- 4.1.7. TRANSPORTING AND TOWING RECOMMISSIONING
- 4.1.8. SPECIAL SAFETY EQUIPMENT
- 4.1.9. SAFETY HARNESS IN CONFORMITY WITH EN 361 (EUROPEAN STANDARD)
- 5. OPERATION
- 5.1. FOREWORD
- 5.2. CONSTRUCTION OF THE EXCAVATOR
- 5.2.1. OVERALL VIEW
- 5.2.2. UNDERCARRIAGE AND SUPERSTRUCTURE
- 5.2.3. HYDRAULICALLY OPERATED ACCESS LADDER
- 5.2.4. EMERGENCY ESCAPE LADDER
- 5.2.5. EMERGENCY ENGINE SHUTDOWN FROM GROUND MAN OR OPERATOR WARNING SYSTEM
- 5.2.6. OPERATORS CAB WITH INTEGRATED FALLING OBJECT PROTECTIVE STRUCTURE (FOPS)
- 5.3. OPERATORS CAB CONTROLS
- 5.3.1. HYDRAULIC CONTROL SYSTEM
- 5.3.2. SAFETY CIRCUIT FOR CONTROLS
- 5.4. ELECTRONIC MONITORING AND CONTROL SYSTEM ECS
- 5.5. OPERATING THE HEATER, VENTILATION AND AIR CONDITIONING
- 5.5.1. A HEATING
- 5.5.2. B COOLING
- 5.5.3. COMBINED OPERATION OF AIR CONDITIONING AND HEATING
- 5.6. POWER HOUSE
- 5.6.1. EMERGENCY ENGINE SHUTDOWN SWITCHES
- 5.6.2. CONTROL AND FILTER PANEL OF REAR AND FRONT POWER UNIT
- 5.7. ELECTRICAL EQUIPMENT IN CAB BASE
- 5.7.1. SWITCH BOARD (X2) IN CAB BASE
- 5.8. CHECKS BEFORE STARTING THE ENGINES
- 5.9. STARTING THE ENGINES
- 5.9.1. STARTING PROCEDURE
- 5.10. MOVING THE EXCAVATOR
- 5.10.1. TRAVEL CONTROL WITH FOOT PEDALS
- 5.10.2. TRAVELLING INSTRUCTIONS
- 5.11. SLEWING AND BRAKING THE SUPERSTRUCTURE
- 5.11.1. SLEWING THE SUPERSTRUCTURE
- 5.12. WORKING WITH THE ATTACHMENT
- 5.12.1. MACHINES EQUIPPED WITH EURO CONTROL SYSTEM
- 5.12.2. MACHINES EQUIPPED WITH KMG CONTROL SYSTEM
- 5.12.3. BOTTOM DUMP BUCKET
- 5.12.4. DROP BALL OPERATION
- 5.12.5. COMBINED OPERATION CYCLES
- 5.13. WORKING INSTRUCTIONS
- 5.13.1. STABILITY OF THE EXCAVATOR
- 5.13.2. EXCAVATOR OPERATION
- 5.14. PARKING THE EXCAVATOR
- 5.15. STOPPING THE ENGINES
- 5.16. OPERATION OF THE LUBRICATION SYSTEM
- 5.16.1. CENTRAL LUBRICATION SYSTEM CLS
- 5.16.2. SWING CIRCLE PINION LUBRICATION SYSTEM SLS
- 5.17. FIRE DETECTION AND SUPPRESSION SYSTEM
- 5.17.1. HIGH LEVEL ALARM FIRE
- 5.17.2. ENGINE SHUTDOWN THROUGH FUEL SHUTOFF SOLENOID VALVE
- 5.17.3. ACTUATION MODES OF THE FIRE SUPPRESSION SYSTEM
- 5.17.4. INDICATION OF OPERATIONAL MODES AT CONTROL MODULE, AFTER AUTOMATIC ACTUATION OF THE FIRE SUPPRESSION SYSTEM
- 5.17.5. LOCATION OF THE EXTINGUISHING AGENT TANK ASSEMBLIES AND EXPELLANT GAS CARTRIDGES ON POWER HOUSE ROOF
- 5.18. CENTRAL REFILLING SYSTEM
- 5.18.1. SYSTEMS CONNECTED TO THE REFILLING SYSTEM
- 5.18.2. OPERATING THE HYDRAULIC SERVICE ARM
- 5.18.3. RECEIVER PANEL WITH MONITOR BOX
- 5.18.4. REFILLABLE GREASE CONTAINERS OF THE CENTRAL LUBRICATION SYSTEM AND SWING CIRCLE LUBRICATION SYSTEM
- 5.19. WORK ON THE LOADER ATTACHMENT
- 5.20. TRANSPORTATION AND LIFTING OF THE EXCAVATOR
- 5.20.1. DISASSEMBLING OF THE EXCAVATOR
- 5.20.2. TRANSPORTATION AND LIFTING
- 5.21. RETRIEVAL PROCEDURE
- 5.22. EXCAVATOR STORAGE
- 5.22.1. PREPARING FOR STORAGE
- 5.22.2. ONE MONTH REPETITIVE SERVICE PERIOD
- 5.22.3. SIX MONTH REPETITIVE SERVICE PERIOD
- 5.22.4. PREPARING FOR OPERATION
- 5.23. TROUBLE SHOOTING
- 5.23.1. ENGINE
- 5.23.2. HYDRAULIC SYSTEM
- 5.23.3. FINAL DRIVES AND SWING MACHINERY
- 5.23.4. CRAWLER TRACKS
- 6. MAINTENANCE
- 6.1. FOREWORD
- 6.2. PRECAUTIONS FOR MAINTENANCE
- 6.3. FUEL AND LUBRICANTS
- 6.4. FILLING CAPACITIES
- 6.5. STANDARD TORQUE LIST
- 6.6. LUBRICATION AND MAINTENANCE SCHEDULE
- 6.6.1. INITIAL SERVICING
- 6.6.2. PERIODIC SERVICING INTERVALS
- 6.6.3. PERIODIC SERVICING SCHEDULE
- 6.6.4. MAINTENANCE OF THE ENGINES
- 6.7. WHEN NECESSARY
- 6.7.1. ENGINE AIR CLEANER MAINTENANCE
- 6.7.2. SWING CIRCLE TOOTHING LUBRICATION
- 6.7.3. AUTOMATIC LUBRICATION SYSTEMS FILL GREASE BARRELS
- 6.7.4. TRACK ROLLERS AND GUIDE WHEELS REPLACE FLOATING SEALS
- 6.7.5. COLD STARTING AID, REPLACE FLUID CYLINDER
- 6.8. EVERY 10 OPERATING HOURS OR DAILY
- 6.8.1. VISUAL INSPECTIONS
- 6.8.2. AIR CLEANER CLEAN PRECLEANER
- 6.8.3. RADIATORS CHECK COOLANT LEVEL
- 6.8.4. TRACK GROUPS CLEAN
- 6.9. EVERY 50 OPERATING HOURS OR WEEKLY
- 6.9.1. SWING MACHINERY, BRAKE HOUSINGS AND MOTOR ADAPTER HOUSINGS CHECK OIL LEVELS
- 6.9.2. TRAVEL GEARS, BRAKE HOUSINGS AND MOTOR ADAPTER HOUSINGS CHECK OIL LEVELS
- 6.9.3. PTOs (PUMP DISTRIBUTOR GEARS) AND OIL RESERVOIR CHECK OIL LEVEL
- 6.9.4. HYDRAULIC ACCESS LADDER CHECK SAFETY SENSOR
- 6.9.5. HYDRAULIC OIL COOLERS INSPECT AND CLEAN IF NECESSARY
- 6.10. EVERY 250 OPERATING HOURS OR MONTHLY
- 6.10.1. AIR CONDITIONING COMPRESSOR CHECK DRIVE BELT TENSION
- 6.10.2. UNDERCARRIAGE PIN CONNECTIONS LUBRICATE
- 6.10.3. SIGNAL HORN COMPRESSOR LUBRICATE
- 6.10.4. HYDRAULIC OIL COOLER FAN BEARINGS CHECK OIL LEVEL
- 6.10.5. RADIATOR FAN BEARINGS CHECK OIL LEVEL
- 6.10.6. AUTOMATIC LUBRICATION SYSTEMS CLEAN INLINE GREASE FILTER
- 6.10.7. CAB AIR CLEANER CLEAN OR REPLACE FILTER ELEMENT
- 6.11. EVERY 500 OPERATING HOURS OR MONTHLY
- 6.11.1. BATTERIES CHECK FLUID LEVEL
- 6.11.2. FLEXIBLE DRIVE COUPLINGS CHECK OIL LEVEL
- 6.11.3. FUEL TANK DRAIN CONDENSATION
- 6.11.4. CRAWLER TRACK INSPECTION
- 6.12. EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH
- 6.12.1. HIGH STRENGTH BOLT CONNECTIONS CHECK TORQUE LOAD
- 6.12.2. HYDRAULIC SYSTEM FILTER SERVICE
- 6.12.3. PTOS (PUMP DISTRIBUTOR GEARS), SWING MACHINERY AND TRAVEL GEARS OIL SAMPLE ANALYSIS
- 6.12.4. SIGNAL HORN COMPRESSOR CLEAN AND LUBRICATE
- 6.12.5. HYDRAULIC TRACK TENSIONING SYSTEM CHECK ACCUMULATORS
- 6.12.6. WATER FILTER REPLACE FILTER CARTRIDGE
- 6.13. EVERY 2000 OPERATING HOURS OR YEARLY
- 6.13.1. HYDRAULIC SYSTEM CHANGE OIL, REPLACE SUCTION STRAINERS AND PULSATION DAMPER
- 6.13.2. EMERGENCY ESCAPE LADDER INSPECTION
- 6.14. EVERY 3000 OPERATING HOURS HOWEVER AT LEAST ONCE A YEAR
- 6.14.1. SWING MACHINERY, BRAKE AND MOTOR ADAPTER HOUSING CHANGE OIL
- 6.14.2. TRAVEL GEARS, BRAKE AND MOTOR ADAPTER HOUSINGS CHANGE OIL
- 6.14.3. PTO (PUMP DISTRIBUTOR GEAR) CHANGE OIL
- 6.15. FIRE PREVENTION
- 6.16. REPAIR WELDINGS
- 6.16.1. PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE UNDERCARRIAGE
- 6.16.2. PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE LOADER ATTACHMENT
- 6.16.3. PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE SUPERSTRUCTURE
- 6.16.4. AFTER FINISHING THE REPAIR WELDINGS ON THE SUPERSTRUCTURE
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAD014800
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM013300
Komatsu Operation and Maintenance Manual PDF
Komatsu 410W Hydraulic Excavator Operation and Maintenance Manual UMGB410W1
Komatsu Operation and Maintenance Manual PDF
Komatsu Operation and Maintenance Manual PDF
Komatsu 430FX-1, 430FXL-1, 445FXL-1 Operation and Maintenance Manual CEAM023702
Komatsu Operation and Maintenance Manual PDF
Komatsu 101 Basics Forklift Truck Operation and Maintenance Manual
Komatsu Operation and Maintenance Manual PDF
Komatsu 503 Motor Grader Operation and Maintenance Manual 2079A-H45
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM011001
Komatsu Operation and Maintenance Manual PDF
Komatsu 4D104E, S4D104E Series Diesel Motor Operation and Maintenance Manual WHBMNEF000
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM011200