Komatsu PC75R-2 Hydraulic Excavator Shop Manual WEBM004000
$40.00
- Type Of Manual: Shop Manual
- Manual ID: WEBM004000
- Format: PDF
- Size: 9.9MB
- Number of Pages: 364
Category: Komatsu Shop Manual PDF
-
Model List:
- PC75R-2 Hydraulic Excavator
- 1. MAIN MENU
- 2. COVER
- 3. CONTENTS
- 4. LIST OF REVISED PAGES
- 5. SAFETY
- 6. FOREWORD
- 7. HOW TO READ THE SHOP MANUAL
- 8. HOISTING INSTRUCTIONS
- 9. STANDARD TIGHTENING TORQUE
- 10. COATING MATERIALS
- 11. ELECTRIC WIRE CODE
- 12. WEIGHT TABLE
- 13. TABLE OF OIL COOLANT QUANTITIES
- 14. STRUCTURE AND FUNCTION
- 14.2. POWER TRAIN
- 14.3. TRACK FRAME
- 14.4. IDLER AND RECOIL SPRING
- 14.5. CARRIER ROLLER
- 14.6. TRACK ROLLER
- 14.7. TRACK SHOE
- 14.8. SWING CIRCLE
- 14.9. SWING MACHINERY
- 14.10. HYDRAULIC CIRCUIT DIAGRAM (STANDARD)
- 14.11. HYDRAULIC CIRCUIT DIAGRAM (2PIECE BOOM)
- 14.12. HYDRAULIC PUMP
- 14.13. SPOOL CONTROL VALVE (STANDARD)
- 14.14. SPOOL CONTROL VALVE (STANDARD2PIECE BOOM)
- 14.15. SWING MOTOR
- 14.16. CENTER SWIVEL JOINT
- 14.17. SERVOCONTROL FEED UNIT
- 14.18. ACCUMULATOR
- 14.19. PPC VALVE (WORK EQUIPMENT)
- 14.20. PPC VALVE (BLADE, BOOM SWING, 2PIECE BOOM)
- 14.21. TRAVEL PPC VALVE
- 14.22. BOOM AND ARM SAFETY VALVE
- 14.23. BLADE SAFETY VALVE
- 14.24. PIECE BOOM SAFETY VALVE
- 14.25. OVERLOAD SENSOR SWITCH
- 14.26. SOLENOID VALVE
- 14.27. ELECTRICAL DIAGRAM (1/3)
- 14.28. ELECTRICAL DIAGRAM (2/3)
- 14.29. ELECTRICAL DIAGRAM (3/3)
- 15. TESTING AND ADJUSTING
- 15.1. NORMAL OR STANDARD TECHNICAL DATA
- 15.2. SPECIAL TOOLS
- 15.3. MEASURING THE ENGINE SPEED
- 15.4. ADJUSTING VALVE CLEARANCE
- 15.5. MEASURING COMPRESSION PRESSURE
- 15.6. TESTING AND ADJUSTING FUEL INJECTION TIMING
- 15.7. TESTING AND ADJUSTING FAN BELT TENSION
- 15.8. ADJUSTING THE STROKE OF THE ACCELERATOR LEVER
- 15.9. ADJUSTING PPC VALVE CLEARANCE
- 15.10. ADJUSTING THE SAFETY MICROSWITCH
- 15.11. MEASURING THE SWING CIRCLE AXIAL CLEARANCE
- 15.12. TESTING AND ADJUSTING TRACKSHOE TENSION
- 15.13. AIR BLEEDING FROM HYDRAULIC CIRCUITS
- 15.14. RELEASING RESIDUAL PRESSURE FROM THE CIRCUITS
- 15.15. CHECKING AND REGULATING PRESSURE IN THE HYDRAULIC CIRCUITS
- 15.16. TESTING AND SETTING OF MAIN VALVES
- 15.17. ADJUSTING PC VALVE
- 15.18. MEASURING LS DIFFERENTIAL PRESSURE AND ADJUSTING LS VALVE
- 15.19. CHECKING AND ADJUSTING PRESSURES IN THE SERVOCONTROL FEED UNIT
- 15.20. MEASURING PUMPS DELIVERY AND FLOW CONTROL STARTING POINT PUMP P1
- 15.21. MEASURING TRAVEL DEVIATION
- 15.22. ADJUSTING THE MAXIMUM SPEED OF THE TRAVEL MOTORS
- 15.23. MEASURING INNER OIL LEAKAGE OF TRAVEL MOTOR
- 15.24. ADJUSTING BOOM AND ARM SAFETY VALVES
- 15.25. ADJUSTING 2nd BOOM SAFETY VALVES
- 15.26. MEASURING AND SETTING OF PRESSURE SWITCH SIGNAL OVERLOAD OPERATION
- 15.27. MEASUREMENT OF INTERNAL OIL LEAKAGES IN THE SWING MOTOR
- 15.28. CHECKING FOR LEAKAGES INSIDE THE SWIVEL JOINT
- 15.29. ANALYSIS OF THE CAUSES OF HYDRAULIC DRIFTS
- 16. DISASSEMBLY AND ASSEMBLY
- 16.1. HOW TO READ THE MANUAL
- 16.2. PRECAUTIONS TO BE TAKEN WHEN WORKING
- 16.3. SPECIAL TOOLS
- 16.4. STARTER MOTOR
- 16.4.1. REMOVAL AND INSTALLATION
- 16.5. ALTERNATOR
- 16.5.1. REMOVAL AND INSTALLATION
- 16.6. INJECTION PUMP
- 16.6.1. REMOVAL
- 16.6.2. INSTALLATION
- 16.7. NOZZLE HOLDER
- 16.7.1. REMOVAL AND INSTALLATION
- 16.8. CYLINDER HEAD
- 16.8.1. REMOVAL
- 16.8.2. INSTALLATION
- 16.9. SEAT
- 16.9.1. REMOVAL AND INSTALLATION
- 16.10. CABIN
- 16.10.1. REMOVAL AND INSTALLATION
- 16.11. ENGINE HOOD
- 16.11.1. REMOVAL AND INSTALLATION
- 16.12. FRONT HOOD
- 16.12.1. REMOVAL AND INSTALLATION
- 16.13. HEATING FAN
- 16.13.1. REMOVAL AND INSTALLATION
- 16.14. HYDRAULIC OIL TANK
- 16.14.1. REMOVAL AND INSTALLATION
- 16.15. ENGINEPUMP GROUP
- 16.16. ENGINEPUMP COUPLING JOINT
- 16.16.1. REMOVAL AND INSTALLATION
- 16.17. MAIN PUMP INPUT SHAFT OIL SEAL
- 16.17.1. REMOVAL AND INSTALLATION
- 16.18. GEAR PUMP
- 16.18.1. REMOVAL AND INSTALLATION
- 16.19. SWIVEL JOINT
- 16.19.1. REMOVAL AND INSTALLATION
- 16.20. SWING MOTOR
- 16.20.1. REMOVAL AND INSTALLATION
- 16.21. SWING MACHINERY
- 16.21.1. REMOVAL AND INSTALLATION
- 16.21.2. DISASSEMBLY
- 16.21.3. ASSEMBLY
- 16.22. CONTROL VALVE
- 16.22.1. REMOVAL AND INSTALLATION
- 16.23. REVOLVING FRAME
- 16.23.1. REMOVAL
- 16.23.2. INSTALLATION
- 16.24. COUNTERWEIGHT
- 16.24.1. REMOVAL AND INSTALLATION
- 16.25. SWING CIRCLE
- 16.25.1. REMOVAL AND INSTALLATION
- 16.26. TRACK SHOES
- 16.26.1. REMOVAL AND INSTALLATION
- 16.27. SPROCKET ASSEMBLY
- 16.27.1. REMOVAL AND INSTALLATION
- 16.28. TRAVEL GEAR MOTOR
- 16.28.1. REMOVAL AND INSTALLATION
- 16.28.2. DISASSEMBLY
- 16.28.3. ASSEMBLY
- 16.29. BALL BEARING PRELOAD
- 16.29.1. ADJUSTING
- 16.30. AXIAL CLEARANCE ON TAPERED ROLLER BEARINGS
- 16.30.1. ADJUSTING
- 16.31. IDLER AND RECOIL SPRING ASSEMBLY
- 16.31.1. REMOVAL AND INSTALLATION
- 16.32. IDLER
- 16.32.1. DISASSEMBLY AND ASSEMBLY
- 16.33. RECOIL SPRING GROUP AND CYLINDER
- 16.33.1. DISASSEMBLY AND ASSEMBLY
- 16.34. TRACK ROLLER
- 16.34.1. REMOVAL AND INSTALLATION
- 16.35. CARRIER ROLLER
- 16.35.1. REMOVAL AND INSTALLATION
- 16.36. PPC VALVE (BOOMBUCKET)
- 16.36.1. REMOVAL
- 16.36.2. INSTALLATION
- 16.37. PPC VALVE (ARMSWING)
- 16.37.1. REMOVAL
- 16.37.2. INSTALLATION
- 16.38. BLADE PPC VALVE
- 16.38.1. REMOVAL AND INSTALLATION
- 16.39. TRAVEL PEDAL CONTROL
- 16.39.1. REMOVAL AND INSTALLATION
- 16.40. t BOOM SWING PEDAL CONTROL
- 16.40.1. REMOVAL AND INSTALLATION
- 16.41. BOOM CYLINDER (FOR 1PIECE BOOM)
- 16.41.1. REMOVAL AND INSTALLATION
- 16.42. BOOM CYLINDER (FOR 2PIECE BOOM)
- 16.42.1. REMOVAL
- 16.42.2. INSTALLATION
- 16.43. d BOOM CYLINDERS
- 16.43.1. REMOVAL
- 16.43.2. INSTALLATION
- 16.44. ARM CYLINDER
- 16.44.1. REMOVAL AND INSTALLATION
- 16.45. BUCKET CYLINDER
- 16.45.1. REMOVAL AND INSTALLATION
- 16.46. BOOM SWING CYLINDER
- 16.46.1. REMOVAL AND INSTALLATION
- 16.47. BLADE CYLINDER
- 16.47.1. REMOVAL AND INSTALLATION
- 16.48. WORK EQUIPMENT CYLINDERS
- 16.48.1. DISASSEMBLY
- 16.48.2. ASSEMBLY
- 16.49. WORK EQUIPMENT (FOR 1PIECE BOOM)
- 16.49.1. REMOVAL AND INSTALLATION
- 16.50. WORK EQUIPMENT (FOR 2PIECE BOOM)
- 16.50.1. REMOVAL
- 16.50.2. INSTALLATION
- 16.51. BUCKET
- 16.51.1. REMOVAL AND INSTALLATION
- 16.52. BOOM (FOR 1PIECE BOOM)
- 16.52.1. REMOVAL AND INSTALLATION
- 16.53. t BOOM
- 16.53.1. REMOVAL
- 16.53.2. INSTALLATION
- 16.54. SWING BRACKET
- 16.54.1. REMOVAL AND INSTALLATION
- 16.55. BLADE
- 16.55.1. REMOVAL AND INSTALLATION
- 17. MAINTENANCE STANDARD
- 17.1. SWING MACHINERY
- 17.2. SERVOCONTROL FEED UNIT
- 17.3. TRAVEL PPC VALVE
- 17.4. PPC VALVE
- 17.5. BLADE SAFETY VALVE
- 17.6. CYLINDERS
- 17.7. WORK EQUIPMENT (1PIECE BOOM)
- 17.8. WORK EQUIPMENT (2PIECE BOOM)
Rate this product
You may also like
Komatsu Shop Manual PDF
$40.00
Login