Komatsu WA250-3 Parallel Tool Carrier Operation and Maintenance Manual CEAM002001
$20.00
- Type Of Manual: Operation and Maintenance Manual
- Manual ID: CEAM002001
- Format: PDF
- Size: 2.2MB
- Number of Pages: 244
-
Model List:
- WA250-3 Parallel Tool Carrier
- 1. MAIN MENU
- 2. COVER
- 3. INTRODUCTION
- 3.1. FORWARD
- 3.2. SAFETY INFORMATION
- 3.3. INTRODUCTION
- 3.3.1. INTENDED USE
- 3.3.2. FEATURES
- 3.3.3. BREAKING IN A NEW MACHINE
- 3.4. LOCATION OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 3.4.1. MACHINE SERIAL NO. PLATE POSITION
- 3.4.2. ENGINE SERIAL NO. PLATE POSITION
- 3.4.3. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 3.5. CONTENTS
- 4. SAFETY
- 4.1. GENERAL PRECAUTIONS
- 4.2. PRECAUTIONS DURING OPERATION
- 4.2.1. BEFORE STARTING ENGINE
- 4.2.2. AFTER STARTING ENGINE
- 4.2.3. TRANSPORTATION
- 4.2.4. BATTERY
- 4.2.5. TOWING
- 4.3. PRECAUTIONS FOR MAINTENANCE
- 4.3.1. BEFORE CARRYING OUT MAINTENANCE
- 4.3.2. DURING MAINTENANCE
- 4.3.3. TIRES
- 4.4. POSITION FOR ATTACHING SAFETY LABELS
- 4.4.1. POSTION FOR ATTACHING SAFETY LABELS
- 5. OPERATION
- 5.1. GENERAL VIEW
- 5.1.1. GENERAL VIEW OF MACHINE
- 5.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 5.2. EXPLANANTION OF COMPONENTS
- 5.2.1. METERS, LAMPS
- 5.2.2. SWITCHES
- 5.2.3. CONTROL LEVERS, PEDAL
- 5.2.4. STEERING COLUMN TILT LEVER
- 5.2.5. CAP WITH LOCK
- 5.2.6. SAFETY BAR
- 5.2.7. TOWING PIN
- 5.2.8. GREASE PUMP CLAMP AND RUBBER RING
- 5.2.9. BACKUP ALARM
- 5.2.10. FUSE
- 5.2.11. SLOW BLOW FUSE
- 5.2.12. STORAGE PLACE FOR THIS MANUAL
- 5.2.13. AUXILIARY POWER SOURCE
- 5.3. CHECK BEFORE STARTING ENGINE
- 5.3.1. WALK AROUND CHECK
- 5.3.2. CHECK BEFORE STARTING
- 5.3.3. ADJUSMENT BEFORE OPERATION
- 5.3.4. OPERATIONS AND CHECKS BEFORE STARTING ENGINE
- 5.3.5. STARTING ENGINE
- 5.3.6. OPERATIONS AND CHECKS AFTER STARTING ENGINE
- 5.3.7. MOVING MACHINE OFF
- 5.3.8. CHANGING GEAR SPEED
- 5.3.9. CHANGING DIRECTION
- 5.3.10. TURNING
- 5.3.11. STOPPING MACHINE
- 5.3.12. OPERATION OF WORK EQUIPMENT (WITH BUCKET TOOL)
- 5.3.13. OPERATAION OF WORK EQUIPMENT (WITH FORK TOOL)
- 5.3.14. OPERATION OF WORK EQUIPMENT (WITH MULTIPURPOSE BUCKET TOOL)
- 5.3.15. OPERATION OF WORK EQUIPMENT (WITH MATERIAL HANDLING ARM)
- 5.3.16. HYDRAULIC QUICK COUPLER
- 5.3.17. WORK POSSIBLE USING PARALLEL TOOL CARRIER
- 5.3.18. PRECAUTIONS FOR OPERATION
- 5.3.19. ADJUSTING BOOM KICKOUT POSITIONER
- 5.3.20. PARKING MACHINE
- 5.3.21. CHECKS AFTER COMPLETTION OF ENGINE OPERATION
- 5.3.22. STOPPING ENGINE
- 5.3.23. CHECKS AFTER STOPPING ENGINE
- 5.3.24. LOCKING
- 5.3.25. HANDLING THE TIRES
- 5.4. TRANSPORTATION
- 5.4.1. LOADING, UNLOADING WORK
- 5.4.2. PRECAUTION FOR LOADING
- 5.4.3. PRECAUTION FOR LIFTING UP THE VEHICLE
- 5.5. COLD WEATHER OPERATIONS
- 5.5.1. PRECAUTIONS FOR LOW TEMPERATURE
- 5.5.2. PRECAUTIONS FOR COMPLETION OF WORK
- 5.5.3. AFTER COLD WEATHER
- 5.6. LONG TERM STORAGE
- 5.6.1. BEFORE STORAGE
- 5.6.2. DURING STORAGE
- 5.6.3. AFTER STORAGE
- 5.7. TROUBLESHOOTING
- 5.7.1. WHEN MACHINE RUNS OUT OF FUEL
- 5.7.2. TOWING THE MACHINE
- 5.7.3. IF BATTERY IS DISCHARGED
- 5.7.4. OTHER TROUBLE
- 6. MAINTENANCE
- 6.1. GUIDES TO MAINTENANCE
- 6.2. OUTLINES OF SERVICE
- 6.2.1. OUTLINE OF OIL, FUEL, COOLANT
- 6.2.2. OUTLINE OF ELECTRICAL SYSTEM
- 6.3. WEAR PARTS LIST
- 6.4. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
- 6.4.1. ENGINE OIL SPECIFICATIONS
- 6.4.2. DIESEL FUEL SPECIFICATIONS
- 6.4.3. COOLANT SPECIFICATIONS
- 6.5. STANDARD TIGHTENING TORQUE FOR BOLTS AND NUTS
- 6.5.1. INTRODUCTION OF NECESSARY TOOLS
- 6.5.2. TORQUE LIST
- 6.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 6.7. MAINTENANCE SCHEDULE CHART
- 6.7.1. MAINTENANCE SCHEDULE CHART
- 6.8. SERVICE PROCEDURES
- 6.8.1. INITIAL 250 HOURS SERVICE
- 6.8.2. WHEN REQUIRED
- 6.8.3. CHECK BEFORE STARTING
- 6.8.4. EVERY 50 HOURS SERVICE
- 6.8.5. EVERY 100 HOURS OF SERVICE
- 6.8.6. EVERY 250 HOURS SERVICE
- 6.8.7. EVERY 500 HOURS SERVICE
- 6.8.8. EVERY 1000 HOURS SERVICE
- 6.8.9. EVERY 2000 HOURS SERVICE
- 7. SPECIFICATIONS
- 7.1. SPECIFICATIONS
- 8. OPTIONS, ATTACHMENTS
- 8.1. AVAILABLE ATTACHMENTS
- 8.2. SELECTING ATTACHMENTS AND TIRES
- 8.3. HEATER AND AIR CONDITIONING (IF EQUIPPED)
- 8.3.1. GENERAL LOCATION AND FUNCTION OF CONTROL PANEL
- 8.3.2. COOL BOX COMPARTMENT
- 8.4. HANDLING E.C.S.S. (ELECTRONIC CONTROLLED SUSPENSION SYSTEM)(IF EQUIPPED)
- 8.4.1. STRUCTURE AND FUNCTION OF E.C.S.S.
- 8.4.2. METHOD OF OPERATING E.C.S.S
- 8.4.3. PRECAUTIONS WHEN OPERATING E.C.S.S.
- 8.4.4. PRECAUTIONS WHEN HANDLING ACCUMULATOR
- 9. Blank Page
Komatsu Operation and Maintenance Manual PDF
Komatsu 503 Motor Grader Operation and Maintenance Manual 2079A-H45
Komatsu Operation and Maintenance Manual PDF
Komatsu 101 Basics Forklift Truck Operation and Maintenance Manual
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM020001
Komatsu Operation and Maintenance Manual PDF
Komatsu 630E Dump Truck Operation and Maintenance Manual DG738
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM014901
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM013300
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM011200
Komatsu Operation and Maintenance Manual PDF
Komatsu Operation and Maintenance Manual PDF
Komatsu 150A, 150FA Crane Operation and Maintenance Manual CEAMC20081
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM010301