Komatsu WB156PS-5 Backhoe Loader Shop Manual CEBM002201
$40.00
- Type Of Manual: Shop Manual
- Manual ID: CEBM002201
- Format: PDF
- Size: 80.9MB
- Number of Pages: 568
Category: Komatsu Shop Manual PDF
-
Model List:
- WB156PS-5 Backhoe Loader
- 1. CONTENTS
- 2. GENERAL
- 2.1. MACHINE SYSTEMS SPECIFICATIONS
- 2.1.1. ENGINE
- 2.1.2. ELECTRICAL SYSTEM
- 2.1.3. SERVICE REFILL CAPACITIES
- 2.2. SPECIFICATION DRAWING
- 2.2.1. SPECIFICATIONS
- 3. STRUCTURE FUNCTION
- 3.1. POWER TRAIN
- 3.2. TRANSMISSION DIAGRAM
- 3.3. TRANSMISSION
- 3.4. FRONT AXLE
- 3.4.1. COMPLETE ASSEMBLY
- 3.5. REAR AXLE
- 3.5.1. COMPLETE ASSEMBLY
- 3.5.2. DIFFERENTIAL
- 3.5.3. FINAL REDUCTION GEARS
- 3.5.4. WHEEL BRAKES
- 3.5.5. DIFFERENTIAL LOCK
- 3.5.6. DELIVERY CONTROL VALVE
- 3.6. MAIN CONTROL VALVE
- 3.6.1. SPOOL CONTROL VALVE
- 3.7. CLSS
- 3.7.1. DESCRIPTION
- 3.7.2. OPERATING PRINCIPLES
- 3.7.3. PPC VALVE (FLOAT RETURN TO DIG)
- 3.8. HYDRAULIC CONTROLS WITHOUT MULTIPURPOSE BUCKET
- 3.9. HYDRAULIC CONTROLS WITH MULTIPURPOSE BUCKET
- 4. LOADER CYLINDERS
- 4.1. BOOM
- 4.1.1. CHARACTERISTICS
- 4.2. BUCKET
- 4.2.1. CHARACTERISTICS
- 4.3. MULTIPURPOSE (MP) BUCKET
- 4.3.1. CHARACTERISTICS
- 5. BACKHOE CYLINDERS
- 5.1. BOOM
- 5.1.1. CHARACTERISTICS
- 5.2.1. CHARACTERISTICS
- 5.3. BUCKET
- 5.3.1. CHARACTERISTICS
- 5.4. TELESCOPIC ARM CYLINDER
- 5.4.1. CHARACTERISTICS
- 5.5. SWING
- 5.5.1. CHARACTERISTICS
- 5.6. OUTRIGGER
- 5.6.1. CHARACTERISTICS
- 6. WORK EQUIPMENT
- 6.1. LOADER
- 6.2. BACKHOE
- 7. AIR CONDITIONING
- 8. STANDARD VALUE TABLE
- 8.1. ENGINE
- 8.2. CHASSIS
- 9. SPECIAL TOOLS
- 10. ENGINE SPEED
- 10.1. ENGINE WITH LOAD
- 10.1.1. MACHINE IN POWER MODE AT MIN
- 10.1.2. WITH CONVERTER STALLED
- 10.1.3. CONVERTER STALLED AND HYDRAULIC PUMP UNDER LOAD
- 10.1.4. ANALYSIS
- 11. VALVE CLEARANCE
- 12. AIR CONDITIONER COMPRESSOR BELT TENSION
- 13. BLEED AIR FROM CIRCUITS
- 13.1. BLEED AIR FROM CYLINDERS
- 13.2. BLEED AIR FROM BRAKING CIRCUIT
- 13.3. RELEASING RESIDUAL PRESSURE
- 14. ACCELERATOR PEDAL AND LEVER
- 14.1. ACCELERATOR PEDAL TRAVEL
- 14.2. ACCELERATOR LEVER TRAVEL
- 14.2.1. INDIVIDUAL PUMP CHECK
- 14.2.2. BRAKE GROUP LEAKAGE
- 15. PARKING BRAKE ADJUSTMENT
- 16. HYDRAULIC CIRCUIT
- 16.1. INTRODUCTION
- 16.1.1. MAIN CONTROL VALVE
- 17. RELIEF VALVES
- 17.1. TESTING
- 17.1.1. UNLOADING VALVE
- 17.1.2. MAIN RELIEF VALVE
- 17.1.3. SECONDARY VALVES
- 18. SETTING RELIEF VALVES
- 18.1. MAIN RELIEF VALVE
- 18.2. CIRCUIT RELIEF VALVES
- 18.2.1. ARM IN, LOADER CURL, BACKHOE BUCKET CURL, BOOM RAISE, AND MP BUCKET
- 18.2.2. SWING, LOADER DUMP, HAMMER, AND BOOM RAISE
- 19. LS DIFFERENTIAL PRESSURE
- 19.1. CONTROL
- 19.2. ADJUSTMENT
- 20. PPC SUPPLY PRESSURE
- 20.1. CHECK
- 20.2. ADJUSTMENT
- 21. PC VALVE
- 21.1. ADJUSTMENT
- 22. STEERING CONTROL SYSTEM
- 22.1. CONTROL
- 22.2. SETTING
- 23. STEERING CYLINDER
- 24. POWER TRAIN GROUP
- 24.1. CONVERTER OIL PRESSURE
- 24.2. CLUTCH ENGAGEMENT PRESSURE
- 24.3. SUPPLY PRESSURE
- 25. TRANSMISSION CLUTCH FUNCTION
- 25.1. MACHINE PREPARATION
- 25.2. CONTROL
- 26. HYDRAULIC DRIFT
- 26.0.1. OUTRIGGERS CIRCUIT WITHOUT LOCK VALVES
- 27. AIR CONDITIONING
- 27.1. WORK TEMPERATURE
- 27.2. UNIT CHECK
- 27.3. EMPTYING THE AIR CONDITIONING UNIT
- 28. TROUBLESHOOTING GUIDE
- 28.1. FRONT AXLE
- 28.2. REAR AXLE
- 28.3. TRANSMISSION
- 29. FUSES AND RELAYS
- 29.1. FUSE AND RELAY PANEL LOCATION
- 29.2. FUSE AND RELAY PANEL LAYOUT
- 29.2.1. FUSES
- 29.2.2. RELAYS
- 29.3. HEATING AND AIR CONDITIONING FUSES AND RELAYS
- 29.3.1. FUSES
- 29.3.2. RELAYS
- 30. HOW TO USE THIS MANUAL
- 30.1. REMOVAL AND INSTALLATION OF COMPONENTS
- 30.1.1. REMOVAL
- 30.1.2. INSTALLATION
- 30.2. OVERHAUL OF COMPONENTS
- 30.2.1. DISASSEMBLY PROCEDURES
- 30.2.2. ASSEMBLY PROCEDURES
- 31. PRECAUTIONS FOR WORK
- 32. SPECIAL TOOL LIST
- 33. CONNECTOR REPAIR PROCEDURES
- 33.1. CONTACT TERMINAL REMOVAL (HD30 TYPE)
- 33.2. CRIMPING CONTACT TERMINAL (HD30 TYPE)
- 33.3. INSERTION OF CONTACT TERMINAL (HD30 TYPE)
- 33.4. CONTACT TERMINAL REMOVAL (DT TYPE)
- 33.5. CRIMPING CONTACT TERMINAL (DT TYPE)
- 33.6. INSERTION OF CONTACT TERMINAL (DT TYPE)
- 33.7. STRIPPING INSULATION
- 34. AIR CONDITIONER CONDENSER
- 35. AIR CONDITIONER COMPRESSOR
- 35.1. REMOVAL
- 35.2. INSTALLATION
- 36. AIR CONDITIONER COMPRESSOR BELT
- 37. OPERATORS SEAT
- 37.1. REMOVAL
- 38. CAB HEATING AND COOLING SYSTEM
- 39. STEERING AND FRONT DASH ASSEMBLY
- 39.1. STEERING WHEEL
- 39.1.1. REMOVAL
- 39.1.2. INSTALLATION
- 39.2. FRONT DASH ASSEMBLY
- 39.3. BLEED AIR FROM BRAKING CIRCUIT
- 40.1. REMOVAL
- 40.2. INSTALLATION
- 41. HYDRAULIC OIL TANK
- 41.1. BLEED AIR FROM CYLINDERS
- 42. TRANSMISSION OVERHAUL PROCEDURES
- 42.1. TORQUE CONVERTER
- 42.1.1. REMOVAL
- 42.1.2. INSTALLATION
- 42.2. PLUGS AND FILTERS
- 42.3. HYDRAULIC SUPPLY LINES
- 42.3.1. DISASSEMBLY
- 42.3.2. ASSEMBLY
- 42.4. TRANSMISSION HOUSING
- 42.4.1. DISASSEMBLY
- 42.4.2. ASSEMBLY
- 42.5. CLUTCH PACK (A) AND GEAR SHAFT (D)
- 42.5.1. DISASSEMBLY
- 42.5.2. CLUTCHES AND DISC INSPECTIONS
- 42.5.3. ASSEMBLY
- 42.5.4. CHECKING CLUTCH FUNCTION
- 42.6. SHAFT (B)
- 42.6.1. DISASSEMBLY
- 42.6.2. CLUTCHES AND DISC INSPECTIONS
- 42.6.3. ASSEMBLY
- 42.7. SHAFT (C)
- 42.7.1. DISASSEMBLY
- 42.7.2. CLUTCHES AND DISC INSPECTIONS
- 42.7.3. t GEAR CLUTCHES
- 42.7.4. d GEAR CLUTCHES
- 42.7.5. h GEAR CLUTCHES
- 42.7.6. ASSEMBLY
- 42.8. SHAFT (E)
- 42.8.1. DISASSEMBLY
- 42.8.2. CLUTCHES AND DISC INSPECTIONS
- 43. STEERING SOLENOID VALVE
- 43.1. REMOVAL
- 43.2. INSTALLATION
- 44. FRONT AXLE ASSEMBLY
- 44.1. REMOVAL
- 44.2. INSTALLATION
- 45. FRONT AXLE OVERHAUL PROCEDURES
- 45.1. STEERING CYLINDER ASSEMBLY
- 45.1.1. DISASSEMBLY
- 45.1.2. ASSEMBLY
- 45.2. FRONT AXLE END PLANETARY ASSEMBLY
- 45.2.1. DISASSEMBLY
- 45.2.2. ASSEMBLY
- 45.3. AXLE END HUB ASSEMBLY
- 46. REAR AXLE ASSEMBLY
- 46.1. REMOVAL
- 46.2. INSTALLATION
- 47. REAR AXLE OVERHAUL PROCEDURES
- 47.1. PARKING BRAKE ASSEMBLY
- 47.1.1. DISASSEMBLY
- 47.1.2. ASSEMBLY
- 47.1.3. MAINTENANCE
- 47.2. SERVICE BRAKE ASSEMBLY
- 47.2.1. DISASSEMBLY
- 47.2.2. ASSEMBLY
- 47.3. REAR AXLE END PLANETARY ASSEMBLY
- 47.4. DIFFERENTIAL LOCK
- 48. FRONT LOADER PPC VALVE
- 48.1. REMOVAL
- 48.2. INSTALLATION
- 49. FRONTEND LOADER ASSEMBLY
- 49.1. LOADER BOOM CYLINDERS
- 49.2. INSTALLATION
- 49.3. BUCKET CYLINDERS
- 49.3.1. REMOVAL
- 49.3.2. INSTALLATION
- 49.4. FRONT LOADER BUCKET
- 49.4.1. REMOVAL
- 49.4.2. INSTALLATION
- 49.5. LOADER BOOM ASSEMBLY
- 49.5.1. REMOVAL
- 49.5.2. INSTALLATION
- 50. BACKHOE PPC VALVE
- 50.1. REMOVAL
- 50.2. INSTALLATION
- 51. PPC VALVE SUPPORT RELEASE CABLES
- 51.1. REMOVAL
- 51.2. INSTALLATION AND ADJUSTING
- 52. PPC VALVE GAS STRUT
- 53. BACKHOE ASSEMBLY
- 53.1. BUCKET CYLINDER
- 53.1.1. REMOVAL
- 53.1.2. INSTALLATION
- 53.2. TELESCOPIC ARM CYLINDER
- 53.3. SWING CYLINDERS
- 53.3.1. REMOVAL
- 53.3.2. INSTALLATION
- 53.4. BOOM LOCK CYLINDER
- 53.5. TELESCOPIC ARM GIBS
- 53.6. BACKHOE SWING FRAME
- 53.6.1. REMOVAL
- 53.6.2. INSTALLATION
- 53.7. OUTRIGGER CYLINDERS
- 54. WORK EQUIPMENT CYLINDER OVERHAUL
- 54.1. LOADER AND BACKHOE CYLINDERS
- 54.1.1. DISASSEMBLY
- 54.1.2. ASSEMBLY
- 54.2. SWING CYLINDERS
- 54.2.1. DISASSEMBLY
- 54.2.2. ASSEMBLY
- 55. Section 90.pdf
- 55.1. DIAGRAMS AND SCHEMATICS
- 55.1.1. HYDRAULIC CIRCUIT
- 55.1.2. ELECTRICAL SCHEMATICS
Rate this product
You may also like
Login