Komatsu PC290LC-6K, PC290NLC-6K Hydraulic Excavator Operation and Maintenance Manual EEAM010303
$20.00
- Type Of Manual: Operation and Maintenance Manual
- Manual ID: EEAM010303
- Format: PDF
- Size: 8.3MB
- Number of Pages: 263
-
Model List:
- PC290LC-6K Hydraulic Excavator
- PC290NLC-6K Hydraulic Excavator
- 1. FOREWORD
- 2. SAFETY INFORMATION
- 2.1. SAFETY MESSAGES
- 2.2. BREAKING IN YOUR NEW MACHINE
- 3. LOCATION OF PLATES, TABLES TO ENTER SERIAL NO. AND DISTRIBUTOR
- 3.1. MACHINE SERIAL NO. PLATE POSITION
- 3.2. ENGINE SERIAL NO. PLATE POSITION
- 3.3. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 3.4. MACHINE SERIAL PLATE.
- 4. SAFETY
- 4.1. GENERAL PRECAUTIONS
- 4.2. PRECAUTIONS DURING OPERATION
- 4.2.1. BEFORE STARTING ENGINE
- 4.2.2. OPERATING MACHINE
- 4.2.3. TRANSPORTATION
- 4.2.4. BATTERY
- 4.2.5. TOWING
- 4.2.6. BUCKET WITH HOOK
- 4.3. PRECAUTIONS FOR MAINTENANCE
- 4.3.1. BEFORE CARRYING OUT MAINTENANCE
- 4.3.2. DURING MAINTENANCE
- 4.4. POSITION FOR ATTACHING SAFETY LABELS
- 4.4.1. POSITION FOR ATTACHING SAFETY LABELS
- 5. OPERATION
- 5.1. GENERAL VIEW
- 5.1.1. GENERAL VIEW OF MACHINE
- 5.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 5.2. EXPLANATION OF COMPONENTS
- 5.2.1. MACHINE MONITOR
- 5.2.2. METERS
- 5.2.3. SWITCHES
- 5.2.4. CONTROL LEVERS, PEDALS
- 5.2.5. AIR CONDITIONER
- 5.2.6. CAB RADIO
- 5.2.7. FUSE
- 5.2.8. FUSIBLE LINK
- 5.2.9. CONTROLLERS
- 5.2.10. TOOL BOX
- 5.2.11. REFUELLING PUMP
- 5.2.12. HANDLING THE ACCUMULATOR
- 5.3. OPERATION
- 5.3.1. CHECK BEFORE STARTING ENGINE
- 5.3.2. STARTING ENGINE
- 5.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
- 5.3.4. MOVING MACHINE OFF
- 5.3.5. STEERING MACHINE
- 5.3.6. STOPPING MACHINE
- 5.3.7. SWINGING
- 5.3.8. OPERATION OF WORK EQUIPMENT
- 5.3.9. HANDLING ACTIVE MODE
- 5.3.10. WORKING MODE SELECTION
- 5.3.11. PROHIBITIONS FOR OPERATION
- 5.3.12. PRECAUTIONS FOR OPERATION
- 5.3.13. PRECAUTIONS WHEN TRAVELLING UP OR DOWN HILLS
- 5.3.14. HOW TO ESCAPE FROM MUD
- 5.3.15. WORK POSSIBLE USING HYDRAULIC EXCAVATOR
- 5.3.16. REPLACEMENT AND INVERSION OF BUCKET
- 5.3.17. PARKING THE MACHINE
- 5.3.18. CHECK AFTER FINISHING WORK
- 5.3.19. STOPPING ENGINE
- 5.3.20. CHECK AFTER STOPPING ENGINE
- 5.4. TRANSPORTATION
- 5.4.1. LOADING, UNLOADING WORK
- 5.5. COLD WEATHER OPERATION
- 5.5.1. PRECAUTIONS FOR LOW TEMPERATURE
- 5.5.2. PRECAUTIONS AFTER COMPLETION OF WORK
- 5.6. LONGTERM STORAGE
- 5.6.1. BEFORE STORAGE
- 5.6.2. DURING STORAGE
- 5.6.3. AFTER STORAGE
- 5.6.4. STARTING MACHINE AFTER LONGTERM STORAGE
- 5.7. TROUBLESHOOTING
- 5.7.1. PHENOMENA THAT ARE NOT FAILURES
- 5.7.2. METHOD OF TOWING MACHINE
- 5.7.3. USING METHOD FOR LIGHTWEIGHT TOWING HOLE
- 5.7.4. PRECAUTIONS ON PARTICULAR JOBSITES
- 5.7.5. IF BATTERY IS DISCHARGED
- 5.7.6. OTHER TROUBLE
- 6. MAINTENANCE
- 6.1. GUIDES TO MAINTENANCE
- 6.2. OUTLINES OF SERVICE
- 6.2.1. OUTLINE OF OIL, FUEL, COOLANT
- 6.2.2. EXPLANATION OF LUBRICATION CHART DECAL
- 6.2.3. OUTLINE OF ELECTRICAL SYSTEM
- 6.2.4. OUTLINE OF HYDRAULIC SYSTEM
- 6.3. WEAR PARTS LIST
- 6.4. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
- 6.4.1. PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
- 6.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 6.5.1. LIST OF NECESSARY TOOLS
- 6.5.2. TORQUE LIST
- 6.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 6.7. MAINTENANCE SCHEDULE CHART
- 6.7.1. MAINTENANCE SCHEDULE CHART
- 6.7.2. MAINTENANCE WHEN USING HYDRAULIC BREAKER
- 6.8. SERVICE PROCEDURE
- 6.8.1. INITIAL 250 HOURS SERVICE
- 6.8.2. WHEN REQUIRED
- 6.8.3. CHECK BEFORE STARTING
- 6.8.4. EVERY 100 HOURS SERVICE
- 6.8.5. EVERY 250 HOURS SERVICE
- 6.8.6. EVERY 500 HOURS SERVICE
- 6.8.7. EVERY 1000 HOURS SERVICE
- 6.8.8. EVERY 2000 HOURS SERVICE
- 6.8.9. EVERY 4000 HOURS SERVICE
- 6.8.10. EVERY 5000 HOURS SERVICE
- 7. SPECIFICATIONS
- 7.1. SPECIFICATIONS
- 7.1.1. PC290LC6K, PC290NLC6K
- 8. OPTIONS, ATTACHMENTS
- 8.1. PRECAUTIONS RELATED TO SAFETY
- 8.1.1. PRECAUTIONS WHEN INSTALLING ATTACHMENTS
- 8.2. HANDLING BUCKET WITH HOOK
- 8.2.1. CHECKING FOR DAMAGE TO BUCKET WITH HOOK
- 8.2.2. PROHIBITED OPERATIONS
- 8.2.3. PRECAUTIONS DURING OPERATIONS
- 8.3. MACHINES READY FOR ATTACHMENTS
- 8.3.1. EXPLANATION OF COMPONENTS
- 8.3.2. ATTACHMENT MOUNTING/DISMOUNTING PROCEDURE
- 8.4. INTRODUCTION OF ATTACHMENTS
- 8.4.1. SPECIFICATION, USE
- 8.4.2. ATTACHMENT INSTALLATION COMBINATION TABLE
- 8.4.3. SELECTION OF TRACK SHOES
- 8.4.4. SELECTION OF BUCKET TEETH
- 8.4.5. HANDLING TRAPEZOIDAL BUCKET
- 8.4.6. USING THE EXTENSION ARM
- 8.4.7. HANDLING THE CLAMSHELL BUCKET
- 8.5. EXTENDING MACHINE SERVICE LIFE
- 8.5.1. HYDRAULIC BREAKER
- 8.5.2. POWER RIPPER
- 8.5.3. MAIN FIELDS OF APPLICATIONS
- 8.5.4. FORK GRAB
- 8.5.5. GRAPPLE BUCKET
- 8.5.6. SCRAP GRAPPLE
- 8.5.7. CRUSHER SMASHER
- 8.5.8. HYDRAULIC PILE DRIVER
- 8.5.9. HYDRAULIC EXCAVATOR WITH MULTIPURPOSE CRANE
- 8.5.10. PC BOOM
Komatsu Operation and Maintenance Manual PDF
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM011200
Komatsu Operation and Maintenance Manual PDF
Komatsu 530M Dump Truck Operation and Maintenance Manual DG716
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM006700
Komatsu Operation and Maintenance Manual PDF
Komatsu 210M Dump Truck Operation and Maintenance Manual DG714
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM013300
Komatsu Operation and Maintenance Manual PDF
Komatsu 503 Motor Grader Operation and Maintenance Manual 2079A-H45
Komatsu Operation and Maintenance Manual PDF
Komatsu 515C, 520C Operation and Maintenance Manual OM515C520C99-1E
Komatsu Operation and Maintenance Manual PDF
Komatsu 150A, 150FA Crane Operation and Maintenance Manual CEAMC20081
Komatsu Operation and Maintenance Manual PDF
Komatsu 4D104E, S4D104E Series Diesel Motor Operation and Maintenance Manual WHBMNEF000