Komatsu D155AX-6 Bull Dozer Operation and Maintenance Manual PEN00131-07
$20.00
- Type Of Manual: Operation and Maintenance Manual
- Manual ID: PEN00131-07
- Format: PDF
- Size: 9.8MB
- Number of Pages: 343
-
Model List:
- D155AX-6 Bull Dozer
- 1. COVER
- 2. FOREWORD
- 2.1. BEFORE READING THIS MANUAL
- 2.2. SAFETY INFORMATION
- 2.3. INTRODUCTION
- 2.3.1. USE OF MACHINE
- 2.3.2. FRONT/REAR, LEFT/RIGHT DIRECTIONS OF MACHINE
- 2.3.3. VISIBILITY FROM OPERATORS SEAT
- 2.4. NECESSARY INFORMATION
- 2.4.1. PRODUCT IDENTIFICATION NUMBER (PIN), MACHINE SERIAL NO. PLATE
- 2.4.2. EPA REGULATIONS, ENGINE NUMBER PLATE
- 2.4.3. BLADE SERIAL NO. PLATE POSITION
- 2.4.4. RIPPER SERIAL NO. PLATE POSITION
- 2.4.5. ROPS, FOPS NO. PLATE POSITION
- 2.4.6. POSITION OF SERVICE METER
- 2.4.7. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 2.5. CONTENTS
- 3. SAFETY
- 3.1. SAFETY
- 3.2. SAFETY LABELS
- 3.2.1. POSITIONS OF SAFETY PICTOGRAMS
- 3.2.2. SAFETY LABELS
- 3.3. GENERAL PRECAUTIONS COMMON TO OPERATION AND MAINTENANCE
- 3.3.1. PRECAUTIONS BEFORE STARTING OPERATION
- 3.3.2. PREPARATIONS FOR SAFE OPERATION
- 3.3.3. FIRE PREVENTION
- 3.3.4. PRECAUTIONS WHEN GETTING ON OR OFF MACHINE
- 3.3.5. DO NOT GET CAUGHT IN WORK EQUIPMENT
- 3.3.6. PRECAUTIONS RELATED TO PROTECTIVE STRUCTURES
- 3.3.7. UNAUTHORIZED MODIFICATION
- 3.3.8. PRECAUTIONS RELATED TO ATTACHMENTS AND OPTIONS
- 3.3.9. PRECAUTIONS WHEN RUNNING ENGINE INSIDE BUILDING
- 3.4. PRECAUTIONS FOR OPERATION
- 3.4.1. PRECAUTIONS FOR JOBSITE
- 3.4.2. STARTING ENGINE
- 3.4.3. OPERATION
- 3.4.4. TRANSPORTATION
- 3.4.5. TOWING
- 3.5. PRECAUTIONS FOR MAINTENANCE
- 3.5.1. PRECAUTIONS BEFORE STARTING INSPECTION AND MAINTENANCE
- 3.5.2. PRECAUTIONS FOR INSPECTION AND MAINTENANCE
- 4. OPERATION
- 4.1. GENERAL VIEW
- 4.1.1. GENERAL VIEW OF MACHINE
- 4.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 4.2. EXPLANATION OF COMPONENTS
- 4.2.1. MACHINE MONITOR
- 4.2.2. SWITCHES
- 4.2.3. CONTROL LEVERS, PEDALS
- 4.2.4. DUST INDICATOR
- 4.2.5. FUSE BOX
- 4.2.6. DOOR POCKET
- 4.2.7. ASHTRAY
- 4.2.8. CAR RADIO, HANDLING
- 4.2.9. CAR STEREO, HANDLING
- 4.2.10. HANDLING AIR CONDITIONER
- 4.3. OPERATION
- 4.3.1. CHECK BEFORE STARTING ENGINE, ADJUST
- 4.3.2. STARTING ENGINE
- 4.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
- 4.3.4. STOPPING ENGINE
- 4.3.5. MOVING MACHINE
- 4.3.6. STOPPING MACHINE
- 4.3.7. SHIFTING GEAR
- 4.3.8. SHIFTING BETWEEN FORWARD AND REVERSE
- 4.3.9. STEERING MACHINE
- 4.3.10. PRECAUTIONS FOR OPERATION
- 4.3.11. PARKING MACHINE
- 4.3.12. CHECK AFTER STOPPING ENGINE
- 4.3.13. CHECK AFTER FINISHING WORK
- 4.3.14. LOCKING
- 4.3.15. RIPPER OPERATION
- 4.3.16. OPERATING METHOD FOR RIPPING OPERATIONS
- 4.3.17. WORK POSSIBLE USING BULLDOZER
- 4.3.18. ADJUSTING POSTURE OF WORK EQUIPMENT
- 4.3.19. TIPS FOR LONGER UNDERCARRIAGE LIFE
- 4.4. TRANSPORTATION
- 4.4.1. LOADING, UNLOADING WORK
- 4.4.2. METHOD OF LIFTING MACHINE
- 4.4.3. PRECAUTIONS FOR TRANSPORTATION
- 4.4.4. TRAVELING ON ROADS
- 4.4.5. REMOVAL OF CAB
- 4.5. COLD WEATHER OPERATION
- 4.5.1. PRECAUTIONS FOR LOW TEMPERATURE
- 4.5.2. AFTER COMPLETION OF WORK
- 4.5.3. AFTER COLD WEATHER
- 4.6. LONGTERM STORAGE
- 4.6.1. BEFORE STORAGE
- 4.6.2. DURING STORAGE
- 4.6.3. AFTER STORAGE
- 4.6.4. STARTING MACHINE AFTER LONGTERM STORAGE
- 4.7. TROUBLESHOOTING
- 4.7.1. AFTER RUNNING OUT OF FUEL
- 4.7.2. METHOD OF TOWING MACHINE
- 4.7.3. IF BATTERY IS DISCHARGED
- 4.7.4. OTHER TROUBLE
- 5. MAINTENANCE
- 5.1. GUIDES TO MAINTENANCE
- 5.2. OUTLINES OF SERVICE
- 5.2.1. HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
- 5.2.2. OUTLINE OF ELECTRIC SYSTEM
- 5.3. WEAR PARTS
- 5.3.1. WEAR PARTS LIST
- 5.4. RECOMMENDED FUEL, COOLANT, AND LUBRICANT
- 5.4.1. RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
- 5.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 5.5.1. TORQUE LIST
- 5.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 5.6.1. SAFETY CRITICAL PARTS
- 5.7. MAINTENANCE SCHEDULE CHART
- 5.7.1. MAINTENANCE SCHEDULE CHART
- 5.8. SERVICE PROCEDURE
- 5.8.1. INITIAL 250 HOURS SERVICE (ONLY AFTER THE FIRST 250 HOURS)
- 5.8.2. WHEN REQUIRED
- 5.8.3. CHECK BEFORE STARTING
- 5.8.4. EVERY 250 HOURS SERVICE
- 5.8.5. EVERY 500 HOURS SERVICE
- 5.8.6. EVERY 1000 HOURS SERVICE
- 5.8.7. EVERY 2000 HOURS SERVICE
- 5.8.8. EVERY 4000 HOURS SERVICE
- 5.8.9. EVERY 8000 HOURS SERVICE
- 6. SPECIFICATIONS
- 6.1. SPECIFICATIONS
- 7. ATTACHMENTS, OPTIONS
- 7.1. GENERAL PRECAUTIONS
- 7.1.1. PRECAUTIONS RELATED TO SAFETY
- 7.2. INTRODUCTION OF ATTACHMENTS AND OPTIONS
- 7.2.1. INTRODUCTION OF ATTACHMENTS AND OPTIONS
- 7.3. HEADREST, HANDLING
- 7.4. CAP WITH LOCK, HANDLING
- 7.4.1. METHOD OF OPENING AND CLOSING CAP WITH LOCK
- 7.5. PROCEDURE FOR SELECTING RIPPER POINT
- 7.5.1. PROCEDURE FOR SELECTING RIPPER POINT
- 7.6. HANDLING MACHINES EQUIPPED WITH KOMTRAX
- 7.6.1. BASIC PRECAUTIONS
- 8. INDEX
Komatsu Operation and Maintenance Manual PDF
Komatsu 150A, 150FA Crane Operation and Maintenance Manual CEAMC20081
Komatsu Operation and Maintenance Manual PDF
Komatsu 630E Dump Truck Operation and Maintenance Manual DG738
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM011200
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM018100
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Field Assembly Instruction CEAW004103
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG713
Komatsu Operation and Maintenance Manual PDF
Komatsu 515C, 520C Operation and Maintenance Manual OM515C520C99-1E
Komatsu Operation and Maintenance Manual PDF
Komatsu 530M Dump Truck Operation and Maintenance Manual DG716
Komatsu Operation and Maintenance Manual PDF
Komatsu 410W Hydraulic Excavator Operation and Maintenance Manual UMGB410W1
Komatsu Operation and Maintenance Manual PDF
Komatsu 450FXL-1 Crawler Feller Buncher Operation and Maintenance Manual CEAM023802