Komatsu D375A-5 Bull Dozer Operation and Maintenance Manual PEN00197-03
$20.00
- Type Of Manual: Operation and Maintenance Manual
- Manual ID: PEN00197-03
- Format: PDF
- Size: 9.6MB
- Number of Pages: 303
-
Model List:
- D375A-5 Bull Dozer
- 1. COVER
- 2. FOREWORD
- 2.1. FOREWORD
- 2.2. SAFETY INFORMATION
- 2.3. INTRODUCTION
- 2.3.1. FRONT/REAR, LEFT/RIGHT DIRECTIONS OF MACHINE
- 2.4. NECESSARY INFORMATION
- 2.4.1. MACHINE SERIAL NO. PLATE AND POSITION
- 2.4.2. ENGINE SERIAL NO. PLATE AND POSITION
- 2.4.3. BLADE SERIAL NO. PLATE POSITION
- 2.4.4. RIPPER SERIAL NO. PLATE POSITION
- 2.4.5. POSITION OF SERVICE METER
- 2.4.6. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 2.5. CONTENTS
- 3. SAFETY
- 3.1. SAFETY
- 3.2. SAFETY LABELS
- 3.2.1. POSITIONS OF SAFETY PICTOGRAMS
- 3.2.2. SAFETY LABELS
- 3.3. GENERAL PRECAUTIONS
- 3.4. PRECAUTIONS FOR OPERATION
- 3.4.1. BEFORE STARTING ENGINE
- 3.4.2. OPERATION
- 3.4.3. TRANSPORTATION
- 3.4.4. BATTERY
- 3.4.5. TOWING
- 3.5. PRECAUTIONS FOR MAINTENANCE
- 4. OPERATION
- 4.1. GENERAL VIEW
- 4.1.1. GENERAL VIEW OF MACHINE
- 4.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 4.2. EXPLANATION OF COMPONENTS
- 4.2.1. FRONT PANEL
- 4.2.2. SWITCHES
- 4.2.3. CONTROL LEVERS, PEDALS
- 4.2.4. SASH GLASS INTERMEDIATE LOCK
- 4.2.5. DOOR POCKET
- 4.2.6. ASHTRAY
- 4.2.7. TOOL BOX
- 4.2.8. CAR STEREO, HANDLING
- 4.2.9. AIR CONDITIONER, HANDLING
- 4.2.10. ACCUMULATOR, HANDLING
- 4.2.11. HANDLING MACHINES EQUIPPED WITH VHMS
- 4.3. OPERATION
- 4.3.1. CHECK BEFORE STARTING ENGINE, ADJUST
- 4.3.2. STARTING ENGINE
- 4.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
- 4.3.4. STOPPING ENGINE
- 4.3.5. CHECK AFTER STOPPING ENGINE
- 4.3.6. MOVING MACHINE
- 4.3.7. STOPPING MACHINE
- 4.3.8. SHIFTING GEAR
- 4.3.9. SHIFTING BETWEEN FORWARD AND REVERSE
- 4.3.10. STEERING MACHINE
- 4.3.11. PRECAUTIONS FOR OPERATION
- 4.3.12. PARKING MACHINE
- 4.3.13. CHECK AFTER FINISHING WORK
- 4.3.14. LOCKING
- 4.3.15. WORK POSSIBLE USING BULLDOZER
- 4.3.16. EFFECTIVE USE OF MODE SELECTION SYSTEM
- 4.3.17. RIPPER OPERATION
- 4.3.18. OPERATING METHOD FOR RIPPING OPERATIONS
- 4.3.19. ADJUSTING POSTURE OF WORK EQUIPMENT
- 4.3.20. TIPS FOR LONGER UNDERCARRIAGE LIFE
- 4.4. TRANSPORTATION
- 4.4.1. TRANSPORTATION PROCEDURE
- 4.4.2. LOADING, UNLOADING WORK
- 4.4.3. PRECAUTIONS FOR LOADING
- 4.4.4. METHOD OF LIFTING MACHINE
- 4.4.5. PRECAUTIONS FOR TRANSPORTATION
- 4.4.6. TRAVELING ON ROADS
- 4.4.7. REMOVAL OF CAB
- 4.4.8. INSTALLATION OF CAB
- 4.5. COLD WEATHER OPERATION
- 4.5.1. PRECAUTIONS FOR LOW TEMPERATURE
- 4.5.2. AFTER COMPLETION OF WORK
- 4.5.3. AFTER COLD WEATHER
- 4.6. LONGTERM STORAGE
- 4.6.1. BEFORE STORAGE
- 4.6.2. DURING STORAGE
- 4.6.3. AFTER STORAGE
- 4.6.4. STARTING MACHINE AFTER LONGTERM STORAGE
- 4.7. TROUBLESHOOTING
- 4.7.1. AFTER RUNNING OUT OF FUEL
- 4.7.2. METHOD OF TOWING MACHINE
- 4.7.3. IF BATTERY IS DISCHARGED
- 4.7.4. OTHER TROUBLE
- 4.7.5. WHEN MODE SELECTION SYSTEM FLASHES
- 5. MAINTENANCE
- 5.1. GUIDES TO MAINTENANCE
- 5.2. OUTLINES OF SERVICE
- 5.2.1. HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
- 5.2.2. OUTLINE OF ELECTRIC SYSTEM
- 5.3. WEAR PARTS
- 5.3.1. WEAR PARTS LIST
- 5.4. RECOMMENDED FUEL, COOLANT, AND LUBRICANT
- 5.4.1. RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
- 5.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 5.5.1. TORQUE LIST
- 5.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 5.6.1. SAFETY CRITICAL PARTS
- 5.7. MAINTENANCE SCHEDULE CHART
- 5.7.1. MAINTENANCE SCHEDULE CHART
- 5.8. SERVICE PROCEDURE
- 5.8.1. INITIAL 250 HOURS SERVICE (ONLY AFTER THE FIRST 250 HOURS)
- 5.8.2. WHEN REQUIRED
- 5.8.3. CHECK BEFORE STARTING
- 5.8.4. EVERY 250 HOURS SERVICE
- 5.8.5. EVERY 500 HOURS SERVICE
- 5.8.6. EVERY 1000 HOURS SERVICE
- 5.8.7. EVERY 2000 HOURS SERVICE
- 5.8.8. EVERY 4000 HOURS SERVICE
- 6. SPECIFICATIONS
- 6.1. SPECIFICATIONS
- 7. ATTACHMENTS, OPTIONS
- 7.1. GENERAL PRECAUTIONS
- 7.1.1. PRECAUTIONS RELATED TO SAFETY
- 7.2. SELECTION OF TRACK SHOE
- 7.2.1. SELECTION OF TRACK SHOES
- 7.3. PROCEDURE FOR SELECTING RIPPER POINT
- 7.3.1. PROCEDURE FOR SELECTING RIPPER POINT
- 7.4. CAP WITH LOCK, HANDLING
- 7.4.1. METHOD OF OPENING AND CLOSING CAP WITH LOCK
- 7.5. EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER
- 7.5.1. BLADE CONDITION
- 7.5.2. DOZING WORK
- 7.5.3. LEVELING (SPREADING) OPERATION
- 7.5.4. DITCHING OPERATION
- 7.5.5. BOULDER RAISING OPERATION
- 7.5.6. SIDECUTTING OPERATIONS
- 7.5.7. HORIZONTAL DOZING OPERATIONS FROM SIDE SLOPE (ROUGH GROUND)
- 7.6. SHOE SLIP CONTROL
- 7.6.1. MODE SELECTION SWITCH PANEL (SHOE SLIP CONTROL)
- 7.6.2. EFFECTIVE USE OF MODE SELECTION SYSTEM
- 7.6.3. IF MODE SELECTION SYSTEM FLASHES
- 8. INDEX
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM011001
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Field Assembly Instruction CEAW004103
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG729
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM020001
Komatsu Operation and Maintenance Manual PDF
Komatsu 101 Basics Forklift Truck Operation and Maintenance Manual
Komatsu Operation and Maintenance Manual PDF
Komatsu 210M Dump Truck Operation and Maintenance Manual DG615
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM018100
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG713
Komatsu Operation and Maintenance Manual PDF
Komatsu 630E Dump Truck Operation and Maintenance Manual DG738
Komatsu Operation and Maintenance Manual PDF
Komatsu 430FX-1, 430FXL-1, 445FXL-1 Operation and Maintenance Manual CEAM023702