Komatsu PC600-8E0, PC600LC-8E0, PC650-8E0, PC650LC-8E0, PC700LC-8E0 Hydraulic Excavator Field Assembly Instruction GEN00101-03
$20.00
- Type Of Manual: Field Assembly Instruction
- Manual ID: GEN00101-03
- Format: PDF
- Size: 17.4MB
- Number of Pages: 215
-
Model List:
- PC600-8E0 Hydraulic Excavator
- PC600LC-8E0 Hydraulic Excavator
- PC650-8E0 Hydraulic Excavator
- PC650LC-8E0 Hydraulic Excavator
- PC700LC-8E0 Hydraulic Excavator
- 1. COVER
- 2. FOREWORD
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. DISPOSAL OF REMOVED PARTS
- 7. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
- 8. KIT LAYOUT DIAGRAM
- 9. TRANSPORTATION
- 10. LIST OF TOOLS FOR FIELD ASSEMBLING
- 11. TIGHTENING TORQUE
- 12. COATING MATERIALS
- 13. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
- 14. Assembly of Chassis
- 14.1. A 1. Installation of Left and Right Track Frames
- 14.2. A 2. Installation of Travel Pipe
- 14.3. A 3. Installation of Operator Cabs Left Handrail
- 14.4. A 4. Installation of Operator Cabs Door Stopper and Striker
- 14.5. A 5. Installation of Rearview Mirror
- 14.6. A 6. Installation of Handrail
- 14.7. A 71. Installation of Step
- 14.8. A 72. Installation of Step
- 14.9. A 8. Installation of Left Side Step
- 14.10. A 9. Sticking Sheet to Counterweight
- 14.11. A10. Installation of Rear View Camera
- 14.12. A11. Installation of Counterweight
- 14.13. A12. Installation of Step Light
- 14.14. A13. Bleeding of Air from Travel Motor
- 14.15. A141. Installation of Travel Piping Cover
- 14.16. A142. Installation of Travel Piping Cover
- 14.17. A15. Installation of Travel Motor Guard
- 14.18. A16. Testing Track Shoe Tension
- 14.19. A17. Check Fuel, Coolant and Oil Levels
- 15. Assembling of Work Equipment
- 15.1. B 1. Assembly of Arm Cylinder
- 15.2. B 2. Connection of Arm Cylinder Hoses
- 15.3. B 3. Installation of Boom Cylinder
- 15.4. B 4. Installation of Boom Cylinder Hoses
- 15.5. B 5. Installation of Boom Foot Dust Seal
- 15.6. B 6. Assembly of Boom Assembly
- 15.7. B 7. Installation of Hoses from Chassis Along Top of Boom
- 15.8. B 8. Connection of Boom Cylinder Head
- 15.9. B 9. Installation of Arm Assembly
- 15.10. B10. Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
- 15.11. B11. Installation of Bucket
- 15.12. B12. Connection of Work Equipment Grease Piping
- 15.13. B13. Connection of Work Equipment Wiring
- 15.14. B14. Greasing after Assembling Work Equipment
- 15.15. B15. Bleeding Air from Work Equipment Circuit
- 15.16. B16. Parts to be Touched up After Field Assembly
- 16. Assembling of Work Equipment of Loading Shovel
- 16.1. C 1. Releasing residual pressure in hydraulic circuit
- 16.2. C 2. Pulling out boom foot pin and boom cylinder foot pin
- 16.3. C 3. Installation of boom cylinder foot
- 16.4. C 4. Installation of boom and arm assembly
- 16.5. C 5. Installation of boom cylinder hoses
- 16.6. C 6. Installation of boom cylinder rod pin
- 16.7. C 7. Installation of boom cylinder
- 16.8. C 8. Installation of arm cylinder hoses
- 16.9. C 9. Installation of bucket cylinder
- 16.10. C10. Installation of bucket cylinder hoses
- 16.11. C11. Installation of connecting hoses between chassis and boom top
- 16.12. C12. Installation of bottom dump cylinder hoses
- 16.13. C13. Installation of bucket assembly
- 16.14. C14. Installation of working lamps
- 16.15. C15. Installation of work equipment grease piping
- 16.16. C16. Grease after assembling of work equipment
- 16.17. C17. Bleeding air from work equipment circuit
- 16.18. C18. Checking oil level in hydraulic tank and adding oil
- 17. ASSEMBLING OF COUNTERWEIGHT REMOVER
- 17.1. D 1. Sticking Sheet to Counterweight
- 17.2. D 2. Adjustment of Shims for Counterweight
- 17.3. D 3. Greasing
- 17.4. D 4. Installation of Counterweight Remover
- 17.5. D 5. Installation of Covers
- 17.6. D 6. Installation of Clamps
- 17.7. D 7. Installation of Hoses
- 17.8. D 8. Bleeding Air from Counterweight Remover Circuit
- 17.9. D 9. Installation of Counterweight
- 17.10. D 10. Installation of Accessories
- 17.11. D 11. Check of Operation
- 18. Procedure for Inspection and Maintenance after Completion of Assembly
- 18.1. M 1. Inspection of Oil Level in Hydraulic Tank and Refill
- 18.2. M 2. Replacement of Return Filter (Standard Filter to Flushing Filter)
- 18.3. M 3. Flushing of Hydraulic Circuit
- 18.4. M 4. Replacement of Return Filter (Flushing Filter to Standard Filter)
- 18.5. M 5. Failure code
- 18.6. M 6. Operating Method of Monitoring
- 19. Field Assembly Inspection Report (Backhoe)
- 20. Field Assembly Inspection Report (Loading Shovel)
Komatsu Operation and Maintenance Manual PDF
Komatsu 210M Dump Truck Operation and Maintenance Manual DG714
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG729
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG713
Komatsu Operation and Maintenance Manual PDF
Komatsu 630E Dump Truck Operation and Maintenance Manual DG738
Komatsu Operation and Maintenance Manual PDF
Komatsu 210M Dump Truck Operation and Maintenance Manual DG615
Komatsu Operation and Maintenance Manual PDF
Komatsu 503 Motor Grader Operation and Maintenance Manual 2079A-H45
Komatsu Operation and Maintenance Manual PDF
Komatsu 730E Dump Truck Operation and Maintenance Manual CEAM013300
Komatsu Operation and Maintenance Manual PDF
Komatsu 101 Basics Forklift Truck Operation and Maintenance Manual
Komatsu Operation and Maintenance Manual PDF
Komatsu 330M Dump Truck Operation and Maintenance Manual DG745
Komatsu Operation and Maintenance Manual PDF
Komatsu 515C, 520C Operation and Maintenance Manual OM515C520C99-1E